Details

  • Building : 34
  • Campus Size: 32 Acres
  • Date of Contruction: 1885-2010
  • Location: Upper West Side, Manhattan

As a campus with state-of-the-art research facilities and a large student body, this Manhattan-based Ivy League institution requires extensive cooling. The large cooling load incurs high utility bills, particularly high peak demand costs during the summertime. EN-POWER GROUP was engaged to identify energy efficiency and demand reduction strategies for the campus’s central chiller plants. The selected strategy not only successfully qualified for over $1 million in rebates, but continues to save the school almost $800,000 in utility costs each year.

The university’s main campus has large cooling requirements due to the year-round computing, laboratory, and classroom demands within its thirty-four (34) buildings. To combat increasing cooling costs, EN-POWER GROUP was engaged to identify methods of realistically reducing cooling costs despite the university’s projected load growth. Following a thorough feasibility study of the existing equipment and energy usage, EN-POWER GROUP recommended consolidating chilled water production to one plant and retiring inefficient equipment by installing a hybrid chilled water plant, which primarily consists of a 2,800-ton electric chiller with variable frequency drives and a 2,800-ton steam-driven chiller. EN-POWER GROUP designed the sequence of operation to optimize demand and electricity savings.

EN-POWER GROUP created and implemented a comprehensive rebate application plan that incorporated funding from four distinct programs. The project successfully received funding from the NYISO Installed Capacity/Special Case Resources (ICAP/SCR) Program, the NYSERDA Existing Facilities Program, the NYSERDA Peak Load Management Program (PLMP), and the NYSERDA Enhanced Commercial and Industrial Performance Program (ECIPP).

Project Achievements

  • 4,737,000 kWh
    Annual Utility Savings
  • $796,000
    Annual Utility Cost Savings
  • 1,800 kW total
    Demand Saved
  • $1,126,000 total
    Eligible Rebates
  • $15,374,000 total
    Project Cost After Rebates

Additional Feature

Identified and applied to four rebate programs to maximize project payback.

Related Projects

  • Energy Auditing
  • Energy Benchmarking
  • Energy Procurement

Manufacturing Plant Achieved $50,000 in Annual Savings from Energy Efficiency and Procurement Studies

  • Green Building Certification

Newly Built Mixed-Use Multifamily Building for Women In Need (WIN) Earns Green Communities Certification

  • Engineering Design and Implementation

Deep Energy Retrofit Saves Multifamily Building $503,000 Annually

Custom Solutions For Your Building's Complex Energy Needs

To support New York City’s ambitious goal of achieving carbon neutrality by 2025, Municipal Courts have enacted local laws that impose significant financial.

    Contact EN-POWER GROUP