implementation
- Rebates & Incentives
- Feasibility Study
- Demand Response
- Mechanical System (HVAC): Cooling
- learn more about our services
Details
- Building : 34
- Campus Size: 32 Acres
- Date of Contruction: 1885-2010
- Location: Upper West Side, Manhattan
As a campus with state-of-the-art research facilities and a large student body, this Manhattan-based Ivy League institution requires extensive cooling. The large cooling load incurs high utility bills, particularly high peak demand costs during the summertime. EN-POWER GROUP was engaged to identify energy efficiency and demand reduction strategies for the campus’s central chiller plants. The selected strategy not only successfully qualified for over $1 million in rebates, but continues to save the school almost $800,000 in utility costs each year.
The university’s main campus has large cooling requirements due to the year-round computing, laboratory, and classroom demands within its thirty-four (34) buildings. To combat increasing cooling costs, EN-POWER GROUP was engaged to identify methods of realistically reducing cooling costs despite the university’s projected load growth. Following a thorough feasibility study of the existing equipment and energy usage, EN-POWER GROUP recommended consolidating chilled water production to one plant and retiring inefficient equipment by installing a hybrid chilled water plant, which primarily consists of a 2,800-ton electric chiller with variable frequency drives and a 2,800-ton steam-driven chiller. EN-POWER GROUP designed the sequence of operation to optimize demand and electricity savings.
EN-POWER GROUP created and implemented a comprehensive rebate application plan that incorporated funding from four distinct programs. The project successfully received funding from the NYISO Installed Capacity/Special Case Resources (ICAP/SCR) Program, the NYSERDA Existing Facilities Program, the NYSERDA Peak Load Management Program (PLMP), and the NYSERDA Enhanced Commercial and Industrial Performance Program (ECIPP).
Project Achievements
- 4,737,000 kWh
Annual Utility Savings - $796,000
Annual Utility Cost Savings - 1,800 kW total
Demand Saved - $1,126,000 total
Eligible Rebates - $15,374,000 total
Project Cost After Rebates
Additional Feature
Identified and applied to four rebate programs to maximize project payback.
Related Projects
Manufacturing Plant Achieved $50,000 in Annual Savings from Energy Efficiency and Procurement Studies
Newly Built Mixed-Use Multifamily Building for Women In Need (WIN) Earns Green Communities Certification
Deep Energy Retrofit Saves Multifamily Building $503,000 Annually
Custom Solutions For Your Building's Complex Energy Needs
To support New York City’s ambitious goal of achieving carbon neutrality by 2025, Municipal Courts have enacted local laws that impose significant financial.