  • Square Footage: 126,000
  • Year Built: 1979
  • Location: : Bourbonnais, IL

HENRY (ARDEX), a manufacturer of premium adhesives, hired EN-POWER GROUP to develop and implement a comprehensive energy plan for their 126,000 sqft industrial facility in Bourbonnais, Illinois. This wide-ranging study incorporated energy benchmarking, energy auditing, and utility and tariff analysis to create an energy master plan for the facility.

To help HENRY identify the most cost-effective energy conservation measures for its manufacturing facility, EN-POWER GROUP’s first step was to understand how the property used its energy. We began by performing energy benchmarking, a process that compares a building’s current energy usage against its past usage as well as against buildings of similar size and type. The energy benchmarking results revealed the facility consumed higher levels of energy than comparable properties, and the on-site energy audit indicated process equipment and lighting could be upgraded to reduce energy usage.

Using the knowledge gained from our energy benchmarking and auditing work, our engineers helped HENRY enter into a more favorable energy contract. Next, our engineers met with HENRY managers to help create an energy master plan with the goals of selecting cost-effective upgrades that maximized the use of available incentives. HENRY replaced its energy-intensive metal halide lighting with high-efficiency fixtures and installed variable frequency drives (VFDs) on air compressor motors to improve operating efficiency. These measures decreased peak demand, decreased operating costs, and increased manufacturing productivity.

Project Achievements

  • 394,000 kWh
    Annual Utility Savings
  • $35,000
    Annual Utility Cost Savings
  • 21%
    Percent Energy Reduced
  • 41 kW
    Demand Saved
  • $15,000
    Additional Annual Procurement Cost Savings

Project Highlights

Created and implemented energy master plan that included replacement of process equipment and energy cost reduction.

Related Projects

  • Commercial
  • Commissioning
  • Compliance
  • Energy Auditing
  • Retro Commissioning

Retro-commissioning Means More than Local Law Compliance

  • Mechanical System Ventilation

Ventilation System Upgrade Improves Indoor Air Quality (IAQ) and Resident Comfort while Saving Energy and Carbon Emissions

  • Energy Auditing

Investment Grade Energy Audit for Dedicated Data Center Identifies Ways to Save $680,000 Annually

Custom Solutions For Your Building's Complex Energy Needs

To support New York City’s ambitious goal of achieving carbon neutrality by 2025, Municipal Courts have enacted local laws that impose significant financial.

    Contact EN-POWER GROUP