implementation

  • Energy Auditing
  • Retro-commissioning
  • learn more about our services

Details

  • Square Footage: 847,000
  • Building Type: Commercial Retail
  • Year Built: 1868
  • Location: Midtown East, Manhattan

An art-deco landmark since it opened in 1868, the Bloomingdale’s Flagship Store in Midtown East, Manhattan is one of the city’s earliest and most popular department stores. The 847,000 sqft facility hired EN-POWER GROUP to perform energy auditing and retro-commissioning to identify measures that would decrease its annual utility and operational costs.

EN-POWER GROUP performed a comprehensive, detailed energy audit of all facility equipment, which enabled Bloomingdale’s to effectively strategize their short-term and long-term energy planning. In order to identify the most impactful, cost-effective measures, our engineers examined the facility’s district steam plant, centrifugal electric chillers, cooling towers, distribution pumps, lighting systems, building envelope, and over seventy (70) air handling units (AHUs). Identified measures included installing a heat exchanger for free cooling, installing a heat recovery system, and upgrading the chilled water plant. Implementing these measures would lead to annual savings of $447,000 on utility costs via 1,943,000 kWh of electricity, 642 kW of demand savings, and 112 MMBTU of district steam.

In addition, project engineers conducted retro-commissioning, a type of in-depth testing, in order to optimize the performance of the current equipment for additional savings. This process included functional performance testing and setpoint and sensor calibration checks on all HVAC equipment. Once testing was complete, we identified improvement measures that included: reprogramming discharge air temperature setpoint resets, repairing air handling units’ dampers and valves with associated actuators, and correcting a variety of control deficiencies on the facility’s building management system (BMS). These measures were ultimately completed with the guidance of EN-POWER GROUP engineers and saved Bloomingdale’s $81,000 per year in utility and maintenance costs, for a simple payback of 2.1 years.

Project Achievements

  • $447,000
    Annual Cost Savings from Identified ECMs
  • 1,944,000 kWh, 642 kW, and 112 MMBTUs
    Annual Electricity Savings from Identified ECMs
  • 8.5years
    Simple Payback
  • $81,000
    Annual Cost Savings from Identified RCMs
  • 219,000 kWh and 1,200 MMBTUs
    Annual Electricity Savings from Identified RCMs
  • 2.1 years
    Simple Payback

Project Highlights

Integration of solar and CHP with one another and into existing systems, green leadership, and $170,000 in annual energy savings.

Related Projects

  • On Site Generation and Renewable Energy
  • Resiliency

Solar PV System Brings Much More Than Renewable Energy

  • Energy Auditing
  • Feasibility Study
  • HVAC Cooling
  • Rebates And Financing
  • Retro Commissioning

Cooling plant and controls upgrade improve facility’s energy grade an entire letter, from a “D” to a “C”

  • Energy Auditing
  • Energy Benchmarking
  • Energy Procurement

Manufacturing Plant Achieved $50,000 in Annual Savings from Energy Efficiency and Procurement Studies

Custom Solutions For Your Building's Complex Energy Needs

To support New York City’s ambitious goal of achieving carbon neutrality by 2025, Municipal Courts have enacted local laws that impose significant financial.

    Contact EN-POWER GROUP