implementation

  • Commissioning
  • Mechanical System (HVAC)
  • learn more about our services

Details

  • Square Footage: 190,000
  • Facility Type: Commercial Retail
  • Year Built: 2019
  • Location: Hudson Yards, Manhattan

Commissioning is crucial for newly installed equipment because its process of detailed testing and inspections ensures equipment will be installed per the approved design. As a result, equipment can work at peak performance to maximize energy efficiency and its lifespan. More importantly, commissioning prevents engineering and safety problems caused by improperly / incorrectly installed equipment, thereby eliminating expensive and time-consuming repairs. Due to the importance of energy efficiency and safety, New York City mandates commissioning for all newly installed equipment.

In order to make sure all equipment would be installed correctly, our commissioning engineers regularly conducted functional performance testing (FPT) and equipment inspections and verifications throughout the year-long construction phase. Moreover, they coordinated meetings with all relevant project stakeholders, including the owner, managers, engineers, and contractors, to keep all parties informed, so corrective measures could be done timely. Upon completion of all the corrective actions, EN-POWER GROUP inspected and verified that all measures were done properly. A final commissioning report was prepared to summarize all corrected deficiencies upon the completion of construction.

EN-POWER GROUP’s commissioning engineers’ hands-on project management and deep equipment knowledge led to timely completion of all HVAC equipment commissioning prior to Neiman Marcus’s grand opening. Most important of all, the department store can enjoy the full benefits of commissioning, including optimized equipment performance, energy savings, enhanced safety, and longer equipment lifespan.

Project Achievements

• Successfully tested building management system and all major HVAC system to ensure proper functionality
• Verified Testing, Adjusting, and Balancing (TAB) of the HVAC system
• Identified needed repairs and adjustments to optimize HVAC equipment
• Coordinated with facility staff to complete all identified measures in a timely manner
• Ensured facility successfully met all commissioning requirements of the New York Energy Conservation Code (NYCECC)

Related Projects

  • Engineering Design and Implementation

Deep Energy Retrofit Saves Multifamily Building $503,000 Annually

  • Energy Auditing

Investment Grade Energy Audit for Dedicated Data Center Identifies Ways to Save $680,000 Annually

  • Hospitality
  • Lighting

Hotel Lighting Upgrade Saves Energy While Matching Art Deco Style

Custom Solutions For Your Building's Complex Energy Needs

To support New York City’s ambitious goal of achieving carbon neutrality by 2025, Municipal Courts have enacted local laws that impose significant financial.

    Contact EN-POWER GROUP