implementation

  • Lighting
  • Project Construction Management
  • learn more about our services

Details

  • Square Footage: 46,000
  • Building Type: Luxury Hotel
  • Year Built: 2011
  • Location: Greenwich Village, Manhattan

As a luxury boutique hotel located in Greenwich Village, Manhattan, the Walker Hotel not only provides attentive service but also delivers an exceptional experience through its chic Art Deco design and elegant atmosphere. When the hotel worked with EN-POWER GROUP to implement lighting upgrades in its lobby, restaurant, and basement, our project staff was committed to delivering a lighting solution that decreased electricity costs while upholding the hotel’s high aesthetic standards.

Aware of a vibrant lighting market containing numerous equipment and manufacturer options, the Walker Hotel hired EN-POWER GROUP to oversee their lighting upgrade and ensure the changes met their facility’s rigorous requirements. The lighting upgrade needed to not only conserve energy and reduce utility costs but also match the hotel’s interior design aesthetic and work with all existing control systems. For example, the lobby is equipped with a custom control panel that adjusts the lighting to different brightness levels and hues throughout the day to maintain a stylish indoor atmosphere. Additionally, the upgrade to the lobby, restaurant, and basement was not to disrupt hotel guests and had to require minimal construction.

EN-POWER GROUP’s lighting team began the project with a detailed audit to gain a better understanding of the Walker Hotel’s existing control systems and identify possible replacement lights. Once the audit was complete, our lighting team then tested all identified options in order to select the appropriate replacement light that would be compatible with the existing lobby control system, match the original lighting’s warmth (i.e., color), and maintain the existing levels of brightness. Finally, EN-POWER GROUP managed all steps of the project construction process to ensure all equipment was quickly and properly installed. The project was completed in fewer than two months and saved the hotel over $11,000 in annual utility and maintenance costs.

Project Achievements

  • $2,900
    Project Cost
  • 43,600 kWh
    Annual Electricity Savings
  • $8,900
    Annual Electricity Cost Savings
  • $2,800
    Annual Maintenance Cost Savings
  • 0.3 years
    Simple Payback
  • 300%
    Return on Investment (ROI)
  • 33 Tons
    Annual Carbon Emission Reduction

Project Highlights

Integration of solar and CHP with one another and into existing systems, green leadership, and $170,000 in annual energy savings.

Related Projects

  • Energy Auditing
  • Energy Modeling
  • Feasibility Study
  • Integrated Physical Needs Assessment IPNA

IPNA Study Unlocks Capital Planning Strategies and Funding Opportunities

  • On Site Generation and Renewable Energy
  • Resiliency

Solar PV System Brings Much More Than Renewable Energy

  • Energy Auditing

Investment Grade Energy Audit for Dedicated Data Center Identifies Ways to Save $680,000 Annually

Custom Solutions For Your Building's Complex Energy Needs

To support New York City’s ambitious goal of achieving carbon neutrality by 2025, Municipal Courts have enacted local laws that impose significant financial.

    Contact EN-POWER GROUP